Wall and floor tiling for Sydney homes and building sites.

Bathrooms, kitchens, floors and outdoor areas for homeowners. Wet areas, lobbies and fit-outs for builders. Same crew, same standard.

Bathroom with white herringbone floor tiles and grey large-format wall tiles
Our tiling, shown with fixtures fitted
Shower tiled in green mosaic walls with a terrazzo-look floor

You'll know the price, the start date and what the floor will look like before we lift a trowel.

We come out, measure, and talk through layout and grout colour with you. The quote is written and itemised. Wet areas get waterproofed and left to cure properly. We clean up every afternoon because you still live there.

Typical jobs
Bathrooms, ensuites, laundries, splashbacks, floors, alfresco and pool areas
Supply
Use tiles you've picked, or we can source them

What we tile

  1. Bathrooms & ensuites

    Floor to ceiling, shower recesses, niches, falls set to the waste.

    HomeCommercial
  2. Waterproofing

    Membrane to wet areas before any tile goes down, to AS 3740.

    HomeCommercial
  3. Kitchens & laundries

    Splashbacks and floors, cut clean around every power point.

    Home
  4. Floors

    Large-format porcelain, timber-look, terrazzo-look, natural stone.

    HomeCommercial
  5. Outdoor & pools

    Alfresco, balconies, steps and pool surrounds in slip-rated tile.

    Home
  6. Patterns & feature walls

    Herringbone, chevron, hexagon and mosaic.

    Home
  7. Multi-unit residential

    Repeat bathrooms and laundries across a whole project.

    Commercial
  8. Lobbies & fit-outs

    Foyers, shops, offices, amenities and hospitality floors.

    Commercial

Recent jobs

Balcony tiled in grey stone-look porcelain beside sliding doors
Balcony, stone-look porcelain
Bathroom walls in white square mosaic with a stone-look floor
Square mosaic walls
Large-format charcoal floor tiles laid in a bathroom
Large-format floor
Bathroom with white wall tiles, a recessed niche and a matching floor
Walls, niche and floor
Dark floor tiles carried up one wall as a feature in a white bathroom
Floor run up the wall

Straight from site, taken the day the tiling was done, before the fixtures went in.

A bathroom, start to finish

Roughly how a standard bathroom runs once the old one is stripped out. Bigger rooms and stone take longer, and we'll tell you up front.

  1. Before

    Measure & quote

    Site visit, layout options, written price.

  2. Day 1

    Prep

    Substrate checked, levelled and falls set.

  3. Day 2–3

    Waterproof

    Membrane on, corners banded, left to cure.

  4. Day 4–6

    Tile

    Set out first so the cuts land out of sight.

  5. Day 7

    Grout & hand over

    Grout, silicone, clean, walk-through with you.

Shower area coated in blue waterproofing membrane before tiling
The part nobody sees. Waterproofing goes on and cures before tiling starts.

Tell us about the job.

A few details is enough to start. Photos or plans help, and you can email them straight to us.

[email protected]

The job is